TUFF AG Agricultural Hydraulic Cylinders 2.5” BORE
These agricultural cylinders are proudly made in Australia and backed by a 2-year manufacturer’s warranty. They feature a screwed gland, high quality honed barrel, hard chrome bar piston rod, slimline design and construction. They are shipped with K1045 1” clevis pins and all cylinders are packaged in clear, heat sealed plastic to reduce dust and moisture.
Certified AUSTRALIAN MADE (with dated serial number)
2 Year Warranty
Maximum Pressure = 3000 PSI (206 BAR)
Ports = 3/4″ UNO (Dual Port)
Clevis Pins = 1″
Piston Rod = 1.1/2″
Bore = 2.5″
| Part # | Stroke | Closed (inch) | Closed (mm) | Open (inch) | Open (mm) |
|---|---|---|---|---|---|
| TAG 2504D | 4” | 16.25” | 412.75 | 20.25” | 514.35 |
| TAG 2506D | 6” | 18.25” | 463.55 | 24.25” | 615.95 |
| TAG 2508D | 8” | 20.25” | 514.35 | 28.25” | 714.55 |
| TAG 2510D | 10” | 22.25” | 565.15 | 32.25” | 819.15 |
| TAG 2512D | 12” | 24.25” | 615.95 | 36.25” | 920.75 |
| TAG 2514D | 14” | 26.25” | 666.75 | 40.25” | 1,022.25 |
| TAG 2516D | 16” | 28.25” | 717.55 | 44.25” | 1,123.25 |
| TAG 2518D | 18” | 30.25” | 768.35 | 48.25” | 1,225.55 |
| TAG 2520D | 20” | 32.25” | 819.15 | 52.25” | 1,327.15 |
| TAG 2522D | 22” | 34.25” | 869.95 | 56.25” | 1,428.75 |
| TAG 2524D | 24” | 36.25” | 920.75 | 60.25” | 1,530.35 |
| TAG 2526D | 26” | 38.25” | 971.55 | 64.25” | 1,631.95 |
| TAG 2528D | 28” | 40.25” | 1,022.25 | 68.25” | 1,733.55 |
| TAG 2530D | 30” | 42.25” | 1,073.15 | 72.25” | 1,835.15 |
| TAG 2536D | 36” | 48.25” | 1,225.55 | 84.25” | 2,139.95 |
| TAG 2542D | 42” | 54.25” | 1,377.95 | 96.25” | 2,444.75 |
| TAG 2548D | 48” | 60.25” | 1,530.35 | 108.25” | 2,749.55 |
These cylinders are direct replacements for the following products:
Alford GT
Alford GS Greenline
AT Hydraulics AG25
Baker Apex
Bare-Co
Eaton M3000
Eureka Rebel 2.5”
EzyFit Phoenix 2.5”
Nordon NA25
QMN AG 25
PT Hydraulics Boss AG25
PTE SLM250
Southcott SAG 25
Tuff TAG 25
WARNING – IMPROPER USE OR SELECTION OF THE PRODUCTS/EQUIPMENT OR SYSTEMS DESCRIBED CAN CAUSE PERSONAL INJURY, DEATH AND/OR PROPERTY DAMAGE. SAFETY PROCEDURES MUST BE APPLIED PRIOR TO INSTALLATION, COMMISIONING AND/OR OPERATION OF EQUIPMENT AND MACHINERY.


